Marine Rescue are called out on an emergency to look for a missing kayaker off Sydney Heads, the swell is huge and he hasn’t been seen for over two hours, now every minute counts. That night, high above Sydney on top of the Sydney Harbour Bridge, the electrical team are trying change major lighting bulbs whilst hanging out 140 metres above the harbour, the approaching storm doesn’t help either. We also follow the team from Polaris Constructions as they build and transport by barge the biggest crane ever assembled on Sydney Harbour to help extend the busy international cruise ship terminal.
Similar Posts

Gigantic Pre-Historic Quarries Built BEFORE The Cataclysm
ByEditor
Pre-Historic Megastructures eBook: https://universeinsideyou.systeme.io/prehistoric-megastructuresThis almost 500-page eBook includes images and contains over 30 of the most…

Pre-Inca Complex Built With Advanced Technology – Qorikancha
ByEditor
Pre-Historic Megastructures eBook: https://universeinsideyou.systeme.io/prehistoric-megastructuresThis almost 500-page eBook includes images and contains over 30 of the most…

Defence review to send ‘message to Moscow’ – Healey
ByEditor
The defence review will send a “message to Moscow” about Britain’s “readiness to fight if required”,…

Operation Barbarossa: The attack / Hitler’s Wehrmacht Attacks Russia
ByEditor
On June 22, 1941, Hitler’s Wehrmacht soldiers invaded the Soviet Union. Without a declaration of war,…

Gen GD Bakshi Predicts Strong Indian Response After Pahalgam Attack
ByEditor
Major General (Retd.) GD Bakshi, speaking from Gurugram on April 29, 2025, shared his analysis on…

Firefighters in flames | First On Scene 11/20 | Crime Scene TV
ByEditor
A routine building fire takes a terrifying turn as an explosion engulfs a group of fire…
